Validity test¶
Cases currently analysed:
base_oem: Base case off-grid OEM -> dispatch of same capacities doesn’t work out
oem_grid_tied_mg: OEM of grid-tied MG
interconnected_buy: Base OEM interconnected with MG, buy (fix PCC)
interconnected_buysell: Base OEM interconnected with MG, buy and sell (fix PCC)
sole_maingrid: Supply only by national grid (no stability criterion)
Costs¶
Distribution grid costs are included in all cases
Main grid interconnection costs are included in all cases with interconnection
Slight difference in PCC capacity (oem_grid_tied, sole_maingrid), as capacity not batch capacities are